Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
1.9%
OF COST SPENT
₹78.12 L spent
of ₹41.67 Cr sanctioned
₹40.88 Cr still to spend
on 222 ongoing works
Works ongoing
222
Open the list of these works →
Sanctioned
₹41.67 Cr
Pure scheme (wage + material)
Expenditure since inception
₹78.12 L
1.9% of sanction
Balance cost (unspent)
₹40.88 Cr
Wage₹24.81 Cr
Material₹16.08 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
BHIND — BHIND ₹43,128
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore