Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
12.8%
OF COST SPENT
₹9.96 L spent
of ₹77.54 L sanctioned
₹67.58 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹77.54 L
Pure scheme (wage + material)
Expenditure since inception
₹9.96 L
12.8% of sanction
Balance cost (unspent)
₹67.58 L
Wage₹52.41 L
Material₹15.17 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh