Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
48.3%
OF COST SPENT
₹3.05 Cr spent
of ₹6.32 Cr sanctioned
₹3.27 Cr still to spend
on 55 ongoing works
Works ongoing
55
Open the list of these works →
Sanctioned
₹6.32 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.05 Cr
48.3% of sanction
Balance cost (unspent)
₹3.27 Cr
Wage₹2.97 Cr
Material₹29.55 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr