MGNREGA + VBGRAMGConstruction of Trench
52%
OF COST SPENT
₹86,374 spent
of ₹1.66 L sanctioned
₹79,734 still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹1.66 L
Pure scheme (wage + material)
Expenditure since inception
₹86,374
52% of sanction
Balance cost (unspent)
₹79,734
Wage₹74,801
Material₹4,933