Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of building/workshed for SHG
38.8%
OF COST SPENT
₹67.79 L spent
of ₹1.75 Cr sanctioned
₹1.07 Cr still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹1.75 Cr
Pure scheme (wage + material)
Expenditure since inception
₹67.79 L
38.8% of sanction
Balance cost (unspent)
₹1.07 Cr
Wage₹9.32 L
Material₹97.75 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh