Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
55.9%
OF COST SPENT
₹75.89 L spent
of ₹1.36 Cr sanctioned
₹59.85 L still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹1.36 Cr
Pure scheme (wage + material)
Expenditure since inception
₹75.89 L
55.9% of sanction
Balance cost (unspent)
₹59.85 L
Wage₹43.91 L
Material₹15.94 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore