Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
3.1%
OF COST SPENT
₹4.20 L spent
of ₹1.36 Cr sanctioned
₹1.32 Cr still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹1.36 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.20 L
3.1% of sanction
Balance cost (unspent)
₹1.32 Cr
Wage₹64.30 L
Material₹67.24 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore