Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.6%
OF COST SPENT
₹21.09 L spent
of ₹37.33 Cr sanctioned
₹37.11 Cr still to spend
on 214 ongoing works
Works ongoing
214
Open the list of these works →
Sanctioned
₹37.33 Cr
Pure scheme (wage + material)
Expenditure since inception
₹21.09 L
0.6% of sanction
Balance cost (unspent)
₹37.11 Cr
Wage₹10.44 Cr
Material₹26.67 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore