Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
76.3%
OF COST SPENT
₹28.47 Cr spent
of ₹37.33 Cr sanctioned
₹8.86 Cr still to spend
on 214 ongoing works
Works ongoing
214
Open the list of these works →
Sanctioned
₹37.33 Cr
Pure scheme (wage + material)
Expenditure since inception
₹28.47 Cr
76.3% of sanction
Balance cost (unspent)
₹8.86 Cr
Wage₹5.55 Cr
Material₹3.31 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore