Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
2.6%
OF COST SPENT
₹3.54 L spent
of ₹1.35 Cr sanctioned
₹1.31 Cr still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹1.35 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.54 L
2.6% of sanction
Balance cost (unspent)
₹1.31 Cr
Wage₹44.05 L
Material₹87.16 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh