Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
37.6%
OF COST SPENT
₹50.72 L spent
of ₹1.35 Cr sanctioned
₹84.02 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹1.35 Cr
Pure scheme (wage + material)
Expenditure since inception
₹50.72 L
37.6% of sanction
Balance cost (unspent)
₹84.02 L
Wage₹22.06 L
Material₹61.96 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh