Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Gabion
10.8%
OF COST SPENT
₹2.61 L spent
of ₹24.04 L sanctioned
₹21.43 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹24.04 L
Pure scheme (wage + material)
Expenditure since inception
₹2.61 L
10.8% of sanction
Balance cost (unspent)
₹21.43 L
Wage₹8.37 L
Material₹13.06 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh