Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Gabion
20.2%
OF COST SPENT
₹3.61 L spent
of ₹17.81 L sanctioned
₹14.21 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹17.81 L
Pure scheme (wage + material)
Expenditure since inception
₹3.61 L
20.2% of sanction
Balance cost (unspent)
₹14.21 L
Wage₹6.73 L
Material₹7.48 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh