Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
50.8%
OF COST SPENT
₹7.06 Cr spent
of ₹13.92 Cr sanctioned
₹6.86 Cr still to spend
on 256 ongoing works
Works ongoing
256
Open the list of these works →
Sanctioned
₹13.92 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.06 Cr
50.8% of sanction
Balance cost (unspent)
₹6.86 Cr
Wage₹2.06 Cr
Material₹4.80 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore