Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of GP Bhawan
51.7%
OF COST SPENT
₹7.67 Cr spent
of ₹14.83 Cr sanctioned
₹7.17 Cr still to spend
on 266 ongoing works
Works ongoing
266
Open the list of these works →
Sanctioned
₹14.83 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.67 Cr
51.7% of sanction
Balance cost (unspent)
₹7.17 Cr
Wage₹2.11 Cr
Material₹5.06 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore