Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
0.7%
OF COST SPENT
₹5,700 spent
of ₹8.21 L sanctioned
₹8.16 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹8.21 L
Pure scheme (wage + material)
Expenditure since inception
₹5,700
0.7% of sanction
Balance cost (unspent)
₹8.16 L
Wage₹5.34 L
Material₹2.81 L