Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
17%
OF COST SPENT
₹1.02 Cr spent
of ₹6.02 Cr sanctioned
₹4.99 Cr still to spend
on 81 ongoing works
Works ongoing
81
Open the list of these works →
Sanctioned
₹6.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.02 Cr
17% of sanction
Balance cost (unspent)
₹4.99 Cr
Wage₹3.13 Cr
Material₹1.86 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore