Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
16.7%
OF COST SPENT
₹1.00 Cr spent
of ₹6.01 Cr sanctioned
₹5.01 Cr still to spend
on 80 ongoing works
Works ongoing
80
Open the list of these works →
Sanctioned
₹6.01 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.00 Cr
16.7% of sanction
Balance cost (unspent)
₹5.01 Cr
Wage₹3.15 Cr
Material₹1.86 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore