Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
67.8%
OF COST SPENT
₹1.21 Cr spent
of ₹1.78 Cr sanctioned
₹57.36 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹1.78 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.21 Cr
67.8% of sanction
Balance cost (unspent)
₹57.36 L
Wage₹28.76 L
Material₹28.60 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh