Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
80.2%
OF COST SPENT
₹5.17 Cr spent
of ₹6.45 Cr sanctioned
₹1.28 Cr still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹6.45 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.17 Cr
80.2% of sanction
Balance cost (unspent)
₹1.28 Cr
Wage₹88.23 L
Material₹39.30 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost