Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
0%
OF COST SPENT
₹0 spent
of ₹15.30 L sanctioned
₹15.30 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹15.30 L
Pure scheme (wage + material)
Expenditure since inception
₹0
0% of sanction
Balance cost (unspent)
₹15.30 L
Wage₹8.93 L
Material₹6.38 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Dindori — Samnapur −₹35.68 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh