Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
24.3%
OF COST SPENT
₹3.72 L spent
of ₹15.30 L sanctioned
₹11.59 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹15.30 L
Pure scheme (wage + material)
Expenditure since inception
₹3.72 L
24.3% of sanction
Balance cost (unspent)
₹11.59 L
Wage₹7.01 L
Material₹4.58 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh