Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
0.9%
OF COST SPENT
₹4.68 L spent
of ₹5.46 Cr sanctioned
₹5.41 Cr still to spend
on 205 ongoing works
Works ongoing
205
Open the list of these works →
Sanctioned
₹5.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.68 L
0.9% of sanction
Balance cost (unspent)
₹5.41 Cr
Wage₹2.24 Cr
Material₹3.17 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore