Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
44.4%
OF COST SPENT
₹2.42 Cr spent
of ₹5.46 Cr sanctioned
₹3.04 Cr still to spend
on 205 ongoing works
Works ongoing
205
Open the list of these works →
Sanctioned
₹5.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.42 Cr
44.4% of sanction
Balance cost (unspent)
₹3.04 Cr
Wage₹83.80 L
Material₹2.20 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore