Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
67%
OF COST SPENT
₹8.22 L spent
of ₹12.27 L sanctioned
₹4.05 L still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹12.27 L
Pure scheme (wage + material)
Expenditure since inception
₹8.22 L
67% of sanction
Balance cost (unspent)
₹4.05 L
Wage₹2.61 L
Material₹1.44 L