Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
11.8%
OF COST SPENT
₹1.45 L spent
of ₹12.27 L sanctioned
₹10.82 L still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹12.27 L
Pure scheme (wage + material)
Expenditure since inception
₹1.45 L
11.8% of sanction
Balance cost (unspent)
₹10.82 L
Wage₹9.37 L
Material₹1.44 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh