Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
0.4%
OF COST SPENT
₹72,300 spent
of ₹2.03 Cr sanctioned
₹2.02 Cr still to spend
on 24 ongoing works
Works ongoing
24
Open the list of these works →
Sanctioned
₹2.03 Cr
Pure scheme (wage + material)
Expenditure since inception
₹72,300
0.4% of sanction
Balance cost (unspent)
₹2.02 Cr
Wage₹1.08 Cr
Material₹94.46 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore