Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
61.6%
OF COST SPENT
₹1.39 Cr spent
of ₹2.26 Cr sanctioned
₹86.98 L still to spend
on 6 ongoing works
Works ongoing
6
Open the list of these works →
Sanctioned
₹2.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.39 Cr
61.6% of sanction
Balance cost (unspent)
₹86.98 L
Wage₹40.08 L
Material₹46.90 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh