Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
57.3%
OF COST SPENT
₹1.47 Cr spent
of ₹2.56 Cr sanctioned
₹1.09 Cr still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹2.56 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.47 Cr
57.3% of sanction
Balance cost (unspent)
₹1.09 Cr
Wage₹55.87 L
Material₹53.51 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh