Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
40.7%
OF COST SPENT
₹1.49 Cr spent
of ₹3.66 Cr sanctioned
₹2.17 Cr still to spend
on 76 ongoing works
Works ongoing
76
Open the list of these works →
Sanctioned
₹3.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.49 Cr
40.7% of sanction
Balance cost (unspent)
₹2.17 Cr
Wage₹1.59 Cr
Material₹57.92 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore