Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
2.8%
OF COST SPENT
₹7.13 L spent
of ₹2.56 Cr sanctioned
₹2.49 Cr still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹2.56 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.13 L
2.8% of sanction
Balance cost (unspent)
₹2.49 Cr
Wage₹76.03 L
Material₹1.73 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore