Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
65.1%
OF COST SPENT
₹49.03 L spent
of ₹75.34 L sanctioned
₹26.30 L still to spend
on 10 ongoing works
Works ongoing
10
Open the list of these works →
Sanctioned
₹75.34 L
Pure scheme (wage + material)
Expenditure since inception
₹49.03 L
65.1% of sanction
Balance cost (unspent)
₹26.30 L
Wage₹15.70 L
Material₹10.60 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh