Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
3.8%
OF COST SPENT
₹3.06 L spent
of ₹81.17 L sanctioned
₹78.11 L still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹81.17 L
Pure scheme (wage + material)
Expenditure since inception
₹3.06 L
3.8% of sanction
Balance cost (unspent)
₹78.11 L
Wage₹24.88 L
Material₹53.23 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh