Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
46.1%
OF COST SPENT
₹3.01 Cr spent
of ₹6.53 Cr sanctioned
₹3.52 Cr still to spend
on 181 ongoing works
Works ongoing
181
Open the list of these works →
Sanctioned
₹6.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.01 Cr
46.1% of sanction
Balance cost (unspent)
₹3.52 Cr
Wage₹1.58 Cr
Material₹1.95 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore