Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Gabion
35%
OF COST SPENT
₹38.56 L spent
of ₹1.10 Cr sanctioned
₹71.49 L still to spend
on 32 ongoing works
Works ongoing
32
Open the list of these works →
Sanctioned
₹1.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹38.56 L
35% of sanction
Balance cost (unspent)
₹71.49 L
Wage₹24.51 L
Material₹46.98 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh