Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Gabion
38.5%
OF COST SPENT
₹43.53 L spent
of ₹1.13 Cr sanctioned
₹69.67 L still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹1.13 Cr
Pure scheme (wage + material)
Expenditure since inception
₹43.53 L
38.5% of sanction
Balance cost (unspent)
₹69.67 L
Wage₹21.84 L
Material₹47.83 L