Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Trench
25.8%
OF COST SPENT
₹1.58 Cr spent
of ₹6.10 Cr sanctioned
₹4.53 Cr still to spend
on 74 ongoing works
Works ongoing
74
Open the list of these works →
Sanctioned
₹6.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.58 Cr
25.8% of sanction
Balance cost (unspent)
₹4.53 Cr
Wage₹3.71 Cr
Material₹82.05 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore