Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
10%
OF COST SPENT
₹69.84 L spent
of ₹6.98 Cr sanctioned
₹6.28 Cr still to spend
on 94 ongoing works
Works ongoing
94
Open the list of these works →
Sanctioned
₹6.98 Cr
Pure scheme (wage + material)
Expenditure since inception
₹69.84 L
10% of sanction
Balance cost (unspent)
₹6.28 Cr
Wage₹5.34 Cr
Material₹93.93 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore