Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
7.3%
OF COST SPENT
₹56,887 spent
of ₹7.84 L sanctioned
₹7.27 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹7.84 L
Pure scheme (wage + material)
Expenditure since inception
₹56,887
7.3% of sanction
Balance cost (unspent)
₹7.27 L
Wage₹4.59 L
Material₹2.68 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh