Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
10%
OF COST SPENT
₹11.81 L spent
of ₹1.19 Cr sanctioned
₹1.07 Cr still to spend
on 24 ongoing works
Works ongoing
24
Open the list of these works →
Sanctioned
₹1.19 Cr
Pure scheme (wage + material)
Expenditure since inception
₹11.81 L
10% of sanction
Balance cost (unspent)
₹1.07 Cr
Wage₹69.55 L
Material₹37.21 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh