Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
9.3%
OF COST SPENT
₹11.95 L spent
of ₹1.29 Cr sanctioned
₹1.17 Cr still to spend
on 26 ongoing works
Works ongoing
26
Open the list of these works →
Sanctioned
₹1.29 Cr
Pure scheme (wage + material)
Expenditure since inception
₹11.95 L
9.3% of sanction
Balance cost (unspent)
₹1.17 Cr
Wage₹74.95 L
Material₹41.82 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh