Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
47.2%
OF COST SPENT
₹1.55 Cr spent
of ₹3.29 Cr sanctioned
₹1.74 Cr still to spend
on 56 ongoing works
Works ongoing
56
Open the list of these works →
Sanctioned
₹3.29 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.55 Cr
47.2% of sanction
Balance cost (unspent)
₹1.74 Cr
Wage₹95.56 L
Material₹77.99 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore