Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
3.1%
OF COST SPENT
₹27.24 L spent
of ₹8.82 Cr sanctioned
₹8.55 Cr still to spend
on 153 ongoing works
Works ongoing
153
Open the list of these works →
Sanctioned
₹8.82 Cr
Pure scheme (wage + material)
Expenditure since inception
₹27.24 L
3.1% of sanction
Balance cost (unspent)
₹8.55 Cr
Wage₹3.86 Cr
Material₹4.68 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
BHIND — BHIND ₹43,128
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore