Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
1.1%
OF COST SPENT
₹5.99 L spent
of ₹5.65 Cr sanctioned
₹5.59 Cr still to spend
on 179 ongoing works
Works ongoing
179
Open the list of these works →
Sanctioned
₹5.65 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.99 L
1.1% of sanction
Balance cost (unspent)
₹5.59 Cr
Wage₹2.34 Cr
Material₹3.25 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
BURHANPUR — KHAKNAR ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh