Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of GP Bhawan
46.1%
OF COST SPENT
₹3.13 Cr spent
of ₹6.79 Cr sanctioned
₹3.66 Cr still to spend
on 188 ongoing works
Works ongoing
188
Open the list of these works →
Sanctioned
₹6.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.13 Cr
46.1% of sanction
Balance cost (unspent)
₹3.66 Cr
Wage₹1.62 Cr
Material₹2.03 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore