Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
40.5%
OF COST SPENT
₹31.25 L spent
of ₹77.16 L sanctioned
₹45.90 L still to spend
on 41 ongoing works
Works ongoing
41
Open the list of these works →
Sanctioned
₹77.16 L
Pure scheme (wage + material)
Expenditure since inception
₹31.25 L
40.5% of sanction
Balance cost (unspent)
₹45.90 L
Wage₹17.97 L
Material₹27.93 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh